Case Studies
![drivetrain testing set up](https://www.iasys.co.in/wp-content/uploads/2022/12/IMG20221102171424-1-300x225.jpg)
Drivetrain/Transmission Testing
iASYS has designed a customized test setup to measure the efficiency and losses of belt-driven powertrains under various belt tensions and iterations, along with a motor.
![](https://www.iasys.co.in/wp-content/uploads/2022/05/engine-transient-test-1-300x138.jpg)
Turnkey Testing Solutions
iASYS developed an end of line test bed/Rig for one of the leading Auto maker to test their engines in a given timeframe.
![](https://www.iasys.co.in/wp-content/uploads/2022/03/WhatsApp-Image-2022-03-03-at-2.29.17-PM-300x200.jpeg)
Container Test Cell for EV motor
iASYS has developed a containerized test rig for electric motor testing to assist electric vehicle start-ups, Tier-1 suppliers, and large OEMs in testing and validating their UUTs for a short duration.
![A Car on the Dynamometer rolls.](https://www.iasys.co.in/wp-content/uploads/2022/01/dayno-300x151.jpg)
Electric Vehicle Testing on a Chassis Dynamometer
How accurately find the road worthiness of the electric vehicle in lab and shift the validation focus from road to rig.
iASYS provided EPA-compliant chassis dynamometers to vehicle certification agencies and major OEMs.
![Electric Vehicle Testing Service](https://www.iasys.co.in/wp-content/uploads/2022/01/ev-as-service-300x147.jpg)
EV Testing as a Service
A start-up company that makes cargo e-vehicles (scooters) for consumers but struggles with the testing and validation processes.
E-Vehicle start up completed their vehicle testing and validation on time without investing in Capex
![](https://www.iasys.co.in/wp-content/uploads/2021/10/orbit-x-case-study-300x124.jpg)
Automotive OEM reduced Non-Productive Time by automating the processes using Orbit Automation Platform
Emission testing is a difficult and crucial stage in vehicle certification and development since users must adhere to high standards and meet all necessary requirements as outlined by standard processes.
![dbrix-fleet-case-study](https://www.iasys.co.in/wp-content/uploads/2021/09/dbrix-fleet-case-study-300x135.jpg)
Distributed and Parallel Computing Platform for large Volumes of Engineering Data
To simulate various driving and traffic situations under varied environmental conditions faced by unit under test (UUT- Transmission), data must be recorded
![](https://www.iasys.co.in/wp-content/uploads/2021/06/2g-1-300x169.jpg)
Centralized Resource Scheduling and Asset Management
Development Validation teams and facility management teams all work in separate silos and interact via e-mail (Asynchronous Communication).
![](https://www.iasys.co.in/wp-content/uploads/2021/07/Model-Based-Systems-Engineering-640x360_tcm54-94796-300x169.jpg)
Centralized Design Validation Plan (DVP), Scheduling and Report Management
A collaborative platform is required where all cross functional team can collaborate seamlessly in Realtime along with all available physical test resources.